BIM Guilt: How many Ds are you doing?
BIM Guilt: the feeling that you aren’t ‘doing’ enough to claim BIM. There is a perception that to qualify as someone doing BIM, you can’t just talk about your 3D models. A mere three dimensions is pathetic. To matter, you better be doing at least 4D models, if not 5D or 6D to really count. SIDE NOTE: If you’re not hip to the extra Ds, it typically means phasing (4D),
